AIRLIVEAIRLIVE
  • News
  • Emergency
  • Accident
  • Incident
  • Tracking
  • Blog
  • Report
  • Military
  • Space
  • CamsLIVE
  • Store
    • T-shirts
    • Hat
    • Models
    • Toys
    • Boeing
    • Airbus
    • Space
    • My Account
    • Order tracking
0

No products in the cart.

Notification Show More
AIRLIVEAIRLIVE
0
Search
  • News
  • Emergency
  • Accident
  • Incident
  • Tracking
  • Blog
  • Report
  • Military
  • Space
  • CamsLIVE
  • Store
    • T-shirts
    • Hat
    • Models
    • Toys
    • Boeing
    • Airbus
    • Space
    • My Account
    • Order tracking
Follow US
AIRLIVE Aviation news network
Get aviation breaking news on WhatsApp
AIRLIVE > All articles > Location > North America > USA > Countdown has already begun for Artemis II
SpaceUSA

Countdown has already begun for Artemis II

Last updated: February 1, 2026, 18:50 UTC
Published: Sunday, February 1, 2026, at 20:43 UTC
Category: Space USA
Author: Seb Mil
NASA’s Space Launch System (SLS) rocket and Orion spacecraft, secured to the mobile launcher, are seen at Launch Pad 39B, Saturday, Jan. 17, 2026, at NASA’s Kennedy Space Center in Florida. NASA’s Artemis II test flight will take Commander Reid Wiseman, Pilot Victor Glover, and Mission Specialist Christina Koch from NASA, and Mission Specialist Jeremy Hansen from the CSA (Canadian Space Agency), around the Moon and back to Earth no later than April 2026. Photo Credit: (NASA/Joel Kowsky)
SHARE

CAPE CANAVERAL, FL — The clock is officially ticking for NASA’s return to the Moon. On Saturday, January 31, 2026, mission controllers at Kennedy Space Center began the 49-hour countdown for the Artemis II “wet dress rehearsal,” a final, high-stakes test before four astronauts embark on a historic lunar flyby.

The countdown clock was activated at 8:13 p.m. EST, targeting a simulated “T-0” and tanking operations for Monday, February 2. This critical rehearsal involves loading the Space Launch System (SLS) rocket with over 700,000 gallons of super-cooled propellant to ensure every system is ready for the real deal.

Key Rehearsal Milestones

Below are some of the key events that take place at each milestone after the countdown
begins. All times are approximate for when these milestones are expected to occur.

L-49 hours 15 minutes and counting

  • L-49H, 15M: The launch team arrives on their stations and the countdown begins
  • L-48H40M: The countdown clock begins
  • L-47H30M – L-38H30M: Fill the water tank for the sound suppression system
  • L-48H45M – L-39H45M: Liquid Oxygen (LOX)/Liquid Hydrogen (LH2) system
    preparations for vehicle loading
  • L-39H30M – L-38H45M: The core stage is powered up
  • L-40H30M – L-39H: The interim cryogenic propulsion stage (ICPS) is powered
    up
  • L-38H45M – L-34H30M: Final preparations of the four RS-25 engines

L-34 hours 30 minutes and counting

  • L-33H45M – L-33H10M: The ICPS is powered down
  • L-32H30M – L-28H30M: Charge Orion flight batteries to 100%
  • L-30H30M – L-23H30M: Charge core stage flight batteries
  • L-19H15M – L-17H45M: The ICPS is powered-up for launch
  • L-19H30M – L-16H: Orion crew suit regulator leak checks

L-15 hours and counting

  • L-14H30M – L-13H: All non-essential personnel leave Launch Complex 39B
  • L-12H45M – 11H15M: Ground Launch Sequencer (GLS) activation
  • L-13H15M – L-11H05M: Air-to-gaseous nitrogen (GN2) changeover and vehicle
    cavity inerting

L-11 hours, 40 minutes and counting

  • L-11H35M – L-9H20M: 2-hour 15-minute built in countdown hold begins
  • L-11H40M – L-10H30M: Launch team conducts a weather and tanking briefing
  • L-10H20M: Launch team decides if they are “go” or “no-go” to begin tanking the
    rocket
  • L-10H10M – L-9H50M: Core stage LOX transfer line chilldown
  • L-10H10M – L-9H25M: Core stage LH2 chilldown
  • L-10H20M – L-9H: Orion cold soak
    L-10 hours and counting
  • L-9H50M – L-9H10M: Core stage LOX main propulsion system chilldown
  • L-9H25M – L-9H: Core stage LH2 slow fill start
  • L-9H20M: Resume T-Clock from T-8H10M
  • L-9H10M – L-8H55M: Core stage LOX slow fill
  • L-9H – L-7H40M: Core stage LH2 fast fill
  • L-8H55M – L-6H10M: Core stage LOX fast fill
  • L-8H45M – L-8H10M: ICPS LH2 chilldown
  • L-8H10M – L-7H25M: ICPS LH2 fast fill start
  • L-7H45M – L-6H: ICPS LOX main propulsion system chilldown
  • L-7H40M – L-7H30M: Core stage LH2 topping
  • L-7H30M – terminal count: Core stage LH2 replenish
  • L-7H25M – L-7H05M: ICPS LH2 vent and relief test
  • L-7H05M – L-6H55M: ICPS LH2 tank topping start
  • L-6H50M – terminal count: ICPS LH2 replenish
  • L-6H10M – L-5H40M: Orion communications system activated (RF to mission
    control)
  • L-6H10M – L-5H40M: Core stage LOX topping

L-6 hours and counting

  • L-6H – L-5H15M: ICPS LOX fast fill
  • L-5H40M – terminal count: Core stage LOX replenish
  • L-5H15M – L-5H: ICPS LOX vent and relief test
  • L-5H – L-4H40M: ICPS LOX topping
  • L-5H40M: Stage pad rescue
  • L-5H40M: Closeout crew assemble
  • L-4H40M – terminal count: ICPS LOX replenish
  • L-4H40M: All stages replenish
  • L-4H40M: Start 40-minute built in hold
  • L-4H40M-L-4H25M: Closeout crew to white room
  • L-4H30M – L-4H20M: Crew Module hatch preps and closure
  • L-4H20M – L-3H20M: Counterbalance mechanism hatch sealpress decay
    checks
  • L-3H20M – L-2H40M: Crew Module Hatch service panel install/closeouts
  • L-2H40M – L2H20M: Launch Abort System (LAS) Hatch closure for flight
  • L-1H10M: Launch Director brief – Flight vehicle/TPS Scan results with CICE
  • L-1H45M – L-1H40M: Closeout crew departs Launch Complex 39B

L-40 minutes and holding

  • L-40M: Built in 30-minute countdown hold begins

L-25 minutes and holding

  • L-25M: Transition team to Orion to Earth communication loop following final NTD
    briefing
  • L-16M: The launch director polls the team to ensure they are “go” for launch

T-10 minutes and counting

  • T-10M: Ground Launch Sequencer (GLS) initiates terminal count
  • T-8M: Crew Access Arm retract
  • T-6M: GLS go for core stage tank pressurization
  • T-6M: Orion set to internal power
  • T-5M57S: Core stage LH2 terminate replenish
  • T-4M: GLS is go for core stage auxiliary power unit (APU) start
  • T-4M: Core Stage APU starts
  • T-4M: Core stage LOX terminate replenish
  • T-3M30S: ICPS LOX terminate replenish
  • T-3M10S: GLS is go for purge sequence 4
  • T-2M02S: ICPS switches to internal battery power
  • T-2M: Booster switches to internal batter power
  • T-1M30S: Hold for three minutes to verify core stage certification hold time
  • T-1M30S: Core stage switches to internal power
  • T-1M20S: ICPS enters terminal countdown mode
  • T-50S: ICPS LH2 terminate replenish
  • T-33S: GLS sends “go for automated launch sequencer” command
  • T-33S: GLS Cutoff/Recycle

Weathering the “Arctic Outbreak”

The rehearsal, originally slated for earlier in the weekend, was pushed to February 2 due to an unusual cold snap in Florida. High winds and near-freezing temperatures forced managers to adjust the timeline to protect the hardware.

What’s Next for the Launch?

If Monday’s rehearsal is successful, NASA will review the data before setting a firm launch date. Because of the weather delay, the earliest possible launch opportunity has shifted to Sunday, February 8, 2026.

BySeb Mil
Seb Mil’s distinguished background in the French Air Force makes him an expert member of the AIRLIVE.net team. Contributes breaking military aviation news, video analyses, flight safety, aerobatic events and general aviation.

LATEST NEWS

Jet2 flight LS1473 made a U-turn over France after pilots declared an emergency
Emergency Europe France Tracking
August 30, 2026
Jet2 Boeing 737-8K2
CDG G-JZHF LS LS1473
American Airlines AA52 declared emergency while five doctors were trying to resuscitate a passenger
Emergency Europe Tracking
August 28, 2026
American Airlines Boeing 777-223ER
AA AA52 FCO N755AN
Qantas plans to begin phasing out its 10 remaining Airbus A380 aircraft
Australia News
August 28, 2026
Qantas Airbus A380-800
QF
Delta DL903 declared an emergency and diverted to Salt Lake City on its way to Seattle
Emergency Tracking USA
August 28, 2026
Delta Air Lines Boeing 757-351
DL DL903 N592NW SLC
Why two Wizz Air flights to London declared an emergency simultaneously
Emergency Europe Tracking UK
August 27, 2026
Wizz Air
LTN W9
United UA127 to Washington is declaring an emergency after departure from Rome
Emergency Europe Tracking
August 27, 2026
United Airlines Boeing 767-322ER
BCN N649UA UA UA127

Related news

IncidentUSA

A DHL Boeing 737-800 cargo experienced a brake lockup and fire upon landing at Los Angeles

August 27, 2026
EmergencyTrackingUSA

Air Canada AC7249 from DFW to Montreal declared emergency after unusual climb to FL410

August 27, 2026
EmergencyTrackingUSA

United UA817 from San Francisco declared an emergency and diverted to Los Angeles

August 21, 2026
NewsTrackingUSA

A Delta pilot requested to stay low after departure from Austin to fly over his kids in the pool

August 18, 2026
AIRLIVE.net is an Aviation news network supported by a team of journalists and aviation enthusiasts.
Add AIRLIVE as Google preferred source
Since 2014, AIRLIVE.net has been publishing accurate aviation news and live updates from our sources around the world. This has led to the creation of the largest aviation community on social media.
Eyewitness to an event?
Alert AIRLIVE's newsdesk on WhatsApp
AIRLIVEAIRLIVE
Follow US
Copyright AIRLIVE 2026
  • Contact
  • Submit a story
  • Privacy policy
  • Return policy
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?