AIRLIVEAIRLIVE
  • News
  • Emergency
  • Accident
  • Incident
  • Stories
  • Tracking
  • Military
  • Space
  • Reports
  • Exclusive
  • CamsLIVE
Notification Show More
AIRLIVEAIRLIVE
Search
  • News
  • Emergency
  • Accident
  • Incident
  • Stories
  • Tracking
  • Military
  • Space
  • Reports
  • Exclusive
  • CamsLIVE
Follow US
AIRLIVE Aviation news network
Get aviation breaking news on WhatsApp
AIRLIVE > All articles > News > NEWS: Continued Runway Construction at KLAX Causing Major Delays Is A Problem
News

NEWS: Continued Runway Construction at KLAX Causing Major Delays Is A Problem

Last updated: January 20, 2016, 22:08 UTC
Published: Monday, July 20, 2015, at 02:50 UTC
Category: News
Author: Melanie Kraft
SHARE

LOS ANGELES – The major construction plan at Los Angeles International Airport was announced and outlined far in advance. It was scheduled to take place in six different phases to attempt to make it as convenient as possible. The FAA and Air Traffic Control officials at KLAX even came up with a plan to implement traffic management initiatives when necessary during construction to control volume. Yet somehow, there was no way for airlines or airport officials to avoid seeing major delays while construction was taking place.

The four runways at KLAX were due for an upgrade/rehabilitation, as it is the sixth busiest airport in the world and sees over 615,000 aircraft taking off/arriving per year. (1) While there is no easy task in shutting down runways to repair/rebuild them at an airport as busy as LAX, something had to be done to fix the rundown airstrips putting the lives of pilots and passengers in danger.

Screenshot via NBAA.org (2)

Currently, the construction is only in stage two of six which is scheduled to be completed in October. However, there is a very real possibility that the construction could take longer in this phase or any phase due to unforeseen circumstances.

During peak hours at Los Angeles International Airport, time management initiatives are put into place in an attempt to lower the volume of aircraft landing or departing. However, mostly the TMI’s have been directed at arrivals causing these flights to be delayed at their origin. Over this past week and during peak hours during the construction phases, arrival delays have been seen at close to three hours. Also, departures out of LAX have seen delays due to reduced departure rates during the construction phases. During these times, the airport is only using three runways due to the fourth runway being the one currently being upgraded. (2)

While keeping the runways in pristine condition and ultimately upgrading them at major airports such as Los Angeles International is important, one must not forget the cause and effect factor. While many think this construction is only affecting flights to and from LAX, the delays caused spread like a virus at the other major airports that service flights to and from Los Angeles. The FAA, airport officials, and the airlines need to figure out a solution to avoid these constant major delays from occurring.

-Aiman Jarrar

References:
1. “Airport Information: General Description.” Los Angeles World Airports. N.p., n.d. Web. 19 July 2015. <http://www.lawa.org/welcome_lax.aspx?id=40>.

2. “Major Runway Construction Plans at Los Angeles International Through 2018.” National Business Aviation Association.
Ed. National Business Aviation Association. International Business
Aviation Council Ltd., 16 June 2015. Web. 19 July 2015.
<http://www.nbaa.org/ops/airports/lax/>.

ByMelanie Kraft
Melanie's aviation journey began at a young age, earning her first pilot certifications while still a teenager, before she ever held a driver’s license! As lead journalist at AIRLIVE.net, she plays a pivotal role in shaping the voice and editorial direction of the website. Her experience spans flight operations, air traffic coordination and emergency incident analysis.
Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

LATEST NEWS

Virgin Atlantic Boeing 787 to JFK just returned to London Heathrow after 3.5 hours in the air
Europe Tracking UK
November 27, 2026
Virgin Atlantic Airways Boeing 787-9
G-VFAN LHR VS VS3
Lufthansa Boeing 747-800 just diverted to Washington Dulles
Tracking USA
November 27, 2026
Lufthansa Boeing 747-830
D-ABYK IAD LH LH499
A Boeing 787-9 reported being hit by lighting strike after departure from Frankfurt
Europe Exclusive Germany Incident Tracking
November 26, 2026
All Nippon Airways Boeing 787-9
JA934A NH NH204
easyJet U2816 is declaring an emergency due to an engine issue and returning to Edinburgh
Emergency Europe Tracking UK
November 26, 2026
easyJet Airbus A321-251NX
EDI G-UZMC U2 U2816
- Advertisement -

Related news

EuropeNews

Norse Atlantic Airways suspends all flight operations effective immediately

November 26, 2026
NewsTrackingUSA

First officier of Alaska Airlines flight reported smell of ‘gym socks’ during takeoff from Portland

November 25, 2026
CanadaNewsTracking

An Air Canada Boeing 737 MAX 8 to Montréal experienced a lightning strike in cruise

November 24, 2026
NewsUSA

Over 40% of Delta’s flights are running behind schedule after weight-and-balance system outage

November 22, 2026
AIRLIVE.net is an Aviation news network supported by a team of journalists and aviation enthusiasts.
Add AIRLIVE as Google preferred source
Since 2014, AIRLIVE.net has been publishing accurate aviation news and live updates from our sources around the world. This has led to the creation of the largest aviation community on social media.
Eyewitness to an event?
Alert AIRLIVE's newsdesk on WhatsApp
AIRLIVEAIRLIVE
Follow US
Copyright AIRLIVE 2026
  • Contact
  • Submit a story
  • Privacy policy
  • Return policy
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?